Our Hot Water Solutions Are Proven to Increase Efficiency


PROJECT SPOTLIGHT: APARTMENT COMPLEX HOT WATER SOLUTION.

This project was for a large multi-unit apartment building complex with 4 tiers. In each tier the total number of apartments is 210. The total apartment count is 440 and all units contain their own bathrooms. As you can see from the photo above, the City View complex is a brillianty constructed and maintained building, designed for tenants who appreciate a nice place to live and call their home.

WHY WE WON THE BID
We were approached to bid this project due to our past performance and expertise in designing and buliding hot water heating systems for similar buildings. After spending several meetings discussing the proposed system and explaining the cost, the coprorate managers decided to award the project to Paragon Mechanical to ensure it would be executed correctly.
WHY WE CHOSE LOCHINVAR
In light of the imporatance of this project and the saturation of the condensing boiler market, we took some time to research and inspect all available boilers. After careful consideration, we selected Lochinvar for this project due to their proven track record of product efficiency, their control system, and the manufacturer's warranty.
NEW SYSTEM RESULTS
The new Lochinvar system we installed has provided the following benefits to the customer:
  • Significantly Improved Energy Efficiency
  • Modulating Burner Control
  • Cutting-Edge User Interface for Easy Control
  • Ease of Maintenance

HOW WE DID IT.
A great deal of planning goes into a commercial project of this magnitude. Below you are able to see some of the steps required for successfully executing a commercial boiler installation.
 

  • Prepare a project timeline
  • Share timeline with management
  • Provide drawings of project to our installation crew for review
  • Preparation and staging of new equipment
  • Removal of old equipment
  • Temporary connection to provide hot water overnight
  • Setting of equipment
  • Piping of venting
  • Piping of plumbing
  • Controls
  • System configuration
  • Start-up specialist technician
  • Final training with customer
This project presented several challenges which, through perseverance and determination, we were able to overcome. We were asked to design the perfect hot water heating system for this customer and do so within the confines of the budget. This forced us to stay on track and ensure we delivered, as expected, every step of the way. We were successful in delivering an exceptional hot water, heating system capable of distributing more hot water at a lower cost of operation. We can realistically expect this system to save our customers between 15% and 27% on operating costs for making hot water. Additionally, we provided an expert service package to keep these boilers running, without fail, for many years.

EXCELLENCE IS A TEAM EFFORT.

At Paragon Mechanical, we believe it to be of the utmost importance to recognize those who have the most influence on our team's success. The support we receive from the partner companies we work with each day is second to only the effort we receive from our own dedicated technicians and employees.

We truly value the support of all our partners. To show our appreciation, we regularly take the time to highlight a recent commercial project and recognize a specific partner who played an integral role in the success of that project. The companies we highlight are always a company we are proud to recommend to our loyal customers and various partners.

The Service You Deserve.   Call Today

We Are

Paragon Logo

Newsletter

Reviews

Top Rated on Google+

5.0 Star Service!
114 Reviews